
Horizon Makers was responsible for the installation of the fireboard cladding system within the Diriyah Tunnel project, ensuring precise execution in line with safety standards and design specifications. The team delivered high-quality installation of fire-rated panels, maintaining accuracy, durability, and seamless alignment with the overall architectural intent. Through efficient on-site coordination and technical expertise, Horizon Makers ensured a clean, consistent finish that enhances both safety performance and the visual environment of the tunnel.